Construct an Intelligent Transportation System (ITS) for the Expressway Sai Gon – Trung Luong

Investor: Cuu Long Corporation for Investment Development and Project Management of Infrastructure

Contractor: SAMSUNG SDH

General Description: In this project, VTG company will play as a sub-contractor for the Samsung SDH and provide a number of specialized equipments as well as participate in some of the construction and installation works of the transmission system and steel pole system along the expressway

 

Construct the North-South Expressway (section Ho Chi Minh City – Dau Giay)

Package No.04: Intelligent Transportation System - ITS

Investor: Vietnam Expressway Corportation

General Contractor: Joint Venture Agreement TOSHIBA – HITACHI PLANT – ITOCHU (THI)

General Description: In this package, VTG company is a sub-contractor of general contractor: Joint Venture Agreement TOSHIBA - HITACHI PLANT - ITOCHU (THI), and directly participate in the following activities:
  • Supply, installation and technology transfer of 01 complete CCTV system alongs the expressay from Km 4 +000 to Km 55 +300 in ITS 004 item – Closed Circuit Television System (CCTV);
  • Supply, installation and technology transfer of 01 complete VDS alongs the expressway from Km 4 +000 to km 55 +300 in ITS 003 item – Vehicled Detection System (VDS);
  • Supply, installation and technology transfer of 01 complete Weather Observation System at the central office at Km 4 +000 in ITS 005 item - Weather Observation System (WOS);
  • Supply, installation and technology transfer of 01 complete WIM station at the entrance of toll collection stations in ITS 015 item – Weigh-In-Motion System (WIM).The final result of tender is expected to be announced before the end of Q3 2013.

The Airport Corporaton of Vietnam

Project: Providing materials, equipments and electric cables for installing lighting power and communication system, automatical meteorological observation system under the building Phú Quốc International Airport

Investor: The Airport Corporaton of Vietnam (ACV)

 

Noi Bai International Airport

Project: Building Cargo Terminal – Nội Bài International Airport

Package No.2C: Installation of M & E Cargo Terminal - Phase 2

Investor: The Airport Corporaton of Vietnam (ACV)


 

International Passenser Terminal Building – Tuy Hoa International Airport

Project: Construct a new International Passenser Terminal Building – Tuy Hoa International Airport

Package No.6: Construct Terminal (including passenser terminal building, complementary block and M&E system; design construction drawings) – M&E Category


Project: Supply and installation of Instrument Landinh system (ILS) – Tuy Hoa Airport

Investor: The Airport Corporaton of Vietnam (ACV)

 

T1 Terminal – Noi Bai International Airport

Project: Construction of a power station for extended T1 Terminal – Noi Bai International Airport
Project: Provide maintainnant services for Passenger Boarding Bridges for Noi Bai International Airport
Project: Supply and installation of weather radar – Tan Son Nhat International Airport
Project: Supply and installation of Near Filed Antenna for Noi Bai International Airport


Investor: The Airport Corporaton of Vietnam (ACV)

 

Buon Ma Thuot International Airport

Project: Investing specialized fire trucks serving the Buon Ma Thuot International Airport

Package: Equip specialized fire trucks for the airport

Investor: The Airport Corporation of Vietnam (ACV)


 

Phu Quoc International Airport

Project: Investing specialized fire trucks serving the Phu Quoc International Airport

Package: Equip specialized fire trucks for the airport


Project: Supply and installation of ShinMaywa’s Aircraft Passenger Boarding Bridge – Phu Quoc International Airport

Investor: The Airport Corporation of Vietnam (ACV)
 

Tuy Hoa International Airport

Project: Investing specialized fire trucks serving the Tuy Hoa International Airport

Package: Equip specialized fire trucks for the airport

Investor: The Airport Corporation of Vietnam (ACV)

 

Dong Hoi Airport

Project: The Airfield Lighting System and Instrument Landing System (ILS) – Dong Hoi Airport

Package No4: The Instrument Landing System (ILS) – Supply and installation of 01 complete Precission Instrument Landing System ILS/DME in compliance with ICAO CAT I standards on the runway 29/11 at Đong Hoi Airport


Project: Supply spare part for AWOS systems - Dong Hoi Airport

Investor: The Airport Corporation of Vietnam (ACV)
 

Tho Xuan Airport

Project: The Airfield Lighting System and Instrument Landing System (ILS) – Tho Xuan Airport

Package: The Instrument Landing System (ILS) – Supply and installation of 01 complete Precission Instrument Landing System ILS/DME in compliance with ICAO CAT I standards on the runway 13/31 at Tho Xuan Airport

Investor: The Airport Corporation of Vietnam (ACV)

 

Cat Bi International Airport

Project: Construction of extended flight area – Cat Bi International Airport

Package No42: Construction, provision and installation of Instrument Landing System ILS/DME

Investor: Hai Phong Bridge Projects Management Department

Lien Khuong Airport

Project: The Instrument Landing System (ILS/DME) – Lien Khuong Airport

Package No.4: Provision of the Instrument Landing System


Project: Supply and installation of ShinMaywa’s Aircraft Passenger Boarding Bridge – Lien Khuong Airport

Investor: Airports Corporation of Vietnam (ACV)

T2 Terminal – Tan Son Nhat International Airport

Project: Supply and installation of ShinMaywa’s Aircraft Passenger Boarding Bridge – Tan Son Nhat International Airport
Project: Supply spare part for ILS/DME systems - Tan Son Nhat Internantional Airport
Project: Provide maintainnant services for Passenger Boarding Bridges for Tan Son Nhat Internatinal Airport
Project: 
Supply and installation of weather radar – Tan Son Nhat International Airport
Project: Supply and installation of PCA, GPU and PWS for Tan Son Nhat International Airport

Investor: Airports Corporation of Vietnam (ACV)

Buon Ma Thuot Airport

Project: The Automated weather observing system - Buon Ma Thuot Airport

Package No.3
Supply and installation of Automated Weather Observing System – Buon Ma Thuot Airport

Investor: Airports Corporation of Vietnam (ACV)

Chu Lai Airport

Project: The Automated Weather Observing System - Chu Lai Airport

Package No.3: Supply and installation of The Automated Weather Observing System

Project: 
Supply and installation of Instrument Landing system (ILS) – Chu Lai Airport

Investor: Airports Corporation of Vietnam (ACV)

Phu Cat Airport

Project: The Automated Weather Observing System - Phu Cat Airport

Package No.3: Supply and installation of The Automated Weather Observing System

Project: Supply and installation of ShinMaywa’s Aircraft Passenger Boarding Bridge – Phu Cat Airport

Project: Supply spare part for AWOS systems - 
Phu Cat Airport

Investor: Airports Corporation of Vietnam (ACV)

Sealite, Carmanah – Can Tho

Project: Supply and installation of Sealite, Carmanah – Can Tho

Investor: Project Management Unit of Waterways

Tho Xuan Airport

Project: The airfield lighting and Instrument landing system - Tho Xuan Airport

Package No.5A: Supply and installation of The Automated Weather Observing System

Investor: Airports Corporation of Vietnam (ACV)

Pleiku Airport

Project: Lengthening and upgrading the runway, taxiways and apron of Pleiku airport

Package No.8: Supply and installation of The Automated Weather Observing System

Investor: Airports Corporation of Vietnam (ACV)

Cat Bi International Airport

Project: Supply and installation of ShinMaywa’s Aircraft Passenger Boarding Bridge – Cat Bi International Airport

Investor: Airports Corporation of Vietnam (ACV)

Ca Mau Airport

Project: The Automated Weather Observing System - Ca Mau Airport

Package No.3: Supply and installation of The Automated Weather Observing System

Investor: Airports Corporation of Vietnam (ACV)

Rach Gia Airport

Project: The Automated Weather Observing System - Rach Gia Airport

Package No.3: Supply and installation of The Automated Weather Observing System

Investor: Airports Corporation of Vietnam (ACV)

Con Dao Airport

Project: The Automated Weather Observing System - Con Dao Airport

Package No.3: Supply and installation of The Automated Weather Observing System

Investor: Airports Corporation of Vietnam (ACV)

Dien Bien Airport

Project: The Automated Weather Observing System - Dien Bien Airport

Package No.3: Supply and installation of The Automated Weather Observing System

Investor: Airports Corporation of Vietnam (ACV)

Da Nang International Airport

Project: The Instrument Landing System ILS/DME CHC 35L - Da Nang International Airport

Package No.3: Provision of The Instrument Landing System

Investor: Airports Corporation of Vietnam (ACV)

Da Nang International Airport

Project: Supply and installation of ShinMaywa’s Aircraft Passenger Boarding Bridge – Da Nang International Airport

Investor: Da Nang International Airport Investment and Exploitation Joint Stock Company (AHT)

 

Da Nang International Airport

Project: Supply and installation of ShinMaywa’s Aircraft Passenger Boarding Bridge – Da Nang International Airport\
Project: 
Supply and installation of weather radar – Tan Son Nhat International Airport

Investor: Airports Corporation of Vietnam (ACV)

Phu Quoc International Airport

Project: Supply and installation of ShinMaywa’s Aircraft Passenger Boarding Bridge – Phu Quoc International Airport

Investor: Airports Corporation of Vietnam (ACV)

Pleiku Airport

Project: The Instrument Landing System (ILS/DME) – Pleiku Airport

Package No.4: Provision of the Instrument Landing System

Investor: Airports Corporation of Vietnam (ACV)

Van Don International Airport

Project: Supply and installation of Instrument Landing system (ILS) – Van Don International Airport

Investor: Sun Group corporation

Pleiku airport

Project : Supply and installation of the Instrument landing system CAT I – Pleiku airport

Investor: The Airport Corporaton of Vietnam (ACV) 

CAT BI International Airport

Project : Supply and installation of Passenger boarding bridge (PBB) – Cat Bi international airport

Investor : The airport corporation of Vietnam (ACV)

Tan Son Nhat International Airport

Project : Supply and installation of Passenger boarding bridge period 1 – Tan Son Nhat international airport

Investor: The Airport Corporation of Vietnam (ACV)

Da Nang International Airport

Project : Supply and installation of Passenger boarding bridge for Terminal 1 

Invester : The Airport Corporation of Vietnam (ACV) 

Description : One passenger boarding bridge 

Da Nang International Airport

Project : Supply and installation of Passenger boarding bridge for Terminal 2 

Investor : AHT company 

Description : 5 passenger boarding bridge, 4 PCA, 4 GPU, 4 PWS, 4 Docking 

Phu Quoc International Airport

Project : Supply and installation of Passenger boarding bridge

Investor: The Airport Corporation of Vietnam (ACV) 

Description : 8 passenger boarding bridge 

Chu Lai Airport

Project : Supply and installation of the Instrument landing system 

Investor : The airport corporation of Vietnam (ACV) 

Description : 1 Instrument landing system 

Van Don Airport

Project : Supply and installation of the Instrument landing system 

Investor: Sungroup

Description : 1 instrument landing system 

Phu Cat Airport

Project : Supply and installation of Passenger boarding bridge 

Investor: The airport corporation of Vietnam (ACV) 

Description : 2 passenger boarding bridge 

Phu Bai International Airport

Project: Supply and installation of 05 passenger boarding bridges for Phu Bai International Airport

Investor: Airports Corporation of Vietnam (ACV)

Noibai International Airport

Project: Investment of Aircraft recovery equipment for common -use at Airports Corporation of Vietnam
Package: Supply of Aircraft recovery equipment

Investor: Airports Corporation of Vietnam (ACV)

Noi Bai International Airport - Weather Radar System

Project: Doppler weather Radar System - Noi Bai International Airport
Package: Supply of Weather Radar System

Investor: Airports Corporation of Vietnam (ACV)

Da Nang International Airport - Weather Radar System

Project: Doppler weather Radar System - Da Nang International Airport
Package: Supply of Weather Radar System

Investor: Airports Corporation of Vietnam (ACV)

Ha Tien - Ghenh Hao - Phu Quoc oceanographic stations

Project: Construction of monitoring network for climate change and sea level rise scenarios for Vietnam
Package: NBD-TB1 "Supply, installation of measuring equipment for 03 reference oceanographic staions: Ha Tien, Ghenh Hao and Phu Quoc

Investor: Vietnam Meteorological and Hydrological Administration

Noi Bai International Airport - Instrument Landing System

Project: Renovating and upgrading runways and taxiways - Noi Bai International Airport
Package: Supply and installation of Instrument Landing System (ILS/DME)

Investor: Ministry of Transport/ Thang Long Project Management Unit